Access to the new office development is via powered gates opening automatically at 7am and
closing at 9pm. Each office building will have an electronic remote key
to operate the gates outside these hours |
| • |
All office buildings are connected to the main drains, via a pumping station |
| • |
Flood water protection is via a 1 million litre capacity sustainable urban drainage system (SUDS) |
| • |
Communal lighting to all external areas |
| • |
Office Lighting – LG3 lighting diffusers to all office areas |
| • |
Cable trunking – each office is fitted with skirting level trunking
containing power and Cat 5E cabling for voice
and data |
| • |
Each office building has its own heat/cool system |